PROJECTS
1- 2016: Swiftts involve in back production/Water injections conversion strategy study, for one of mature fields in Oman.
2- 2016: Swiftts involve in understand the high CGR observed in the flank wells and to explain the variability in the fluid type produced study-Omani field.
3- 2016: Swiftts have been awarded a contract to review and monitor the HSE performance of the drilling and workover rigs for an operator in Oman.
4- 2016: Swiftts have been involved in a Quantitative Risk Assessment for Gas wells for a major operator in Oman.
5- 2015: Swiftts involve in Annual Review Petroleum Resources (ARPR) study for Omani field.
6- 2015: Swiftts involve in Reserves Audit and certifications for mature field in Oman and for international client.
7- 2015: Swiftts have been awarded a contract to conduct a Gas Concept And Optimization for a major field in Oman.
8- 2015: Swiftts have been awarded a contract to conduct a Production Enhancement and ArtificiaL Lift Management for a major operator in Oman.
9- 2015: Swiftts have been awarded to provide CPL and Drilling Consultation for one of the new field in Oman.
10- 2015: Swiftts provided development Geologist to build up reservoir models for a major operator in Oman.
11- 2015: Swiftts have been involved in the provision of Supply Chain Management for a major operator in Oman.
12- 2015: Swiftts conducted full review of Drilling Operating Procedure for a major drilling contractor in Oman.
13- 2015: Swiftts conducted a full training and competency assessment for the drilling crew for a major operator in Oman.